ok, i have my two projects ready, and i played around with the run_project.sh script.
running two terminals i can stop one project when invoking the other. but it is not very responsive. it takes about 2 seconds before the old project stops and another second until the new project starts.
so that seems like not a great way to switch patches on the fly.
i would really like a solution with 3 or 4 buttons attached to the BELA, where each button stops the preceding and runs the specified patch. so i.e. button1 always runs project nr.1. button4 always runs button nr.4
is this possible?